About Us
History
West Coast Pipe (formerly West Coast Pipe Linings, Inc.) was organized in 1978 to provide materials and services to the Waterworks Industry. Our introduction into the market place found us located on a one acre parcel in Fontana processing small orders by hand.
As the company continued to grow, machinery was designed and built to increase our capabilities and production rates. West Coast Pipe slowly advanced into the Waterworks market and established itself as a supplier of fabricated steel pipe and specials.
In 1996, the company was purchased by State Pipe & Supply, which resulted in a planned 20 acre state of the art facility in Rialto, California. Our expansion has, among other things, provided a new 15,000 square foot fabrication facility capable of 96” diameter pipe and fittings.
Newly designed and built automated machinery now allows us to process cement lined and cement coated steel pipe from 3” up to and including 48” in diameter. Other capabilities include abrasive saw cutting, rolling and forming of steel plate specials, preparation of weld bell joint ends, sandblasting, epoxy applications and other specialized linings, coatings and services.
Location
Our Rialto Facility is strategically positioned in the heart of the Inland Empire - below the Cajon Pass between the 15 & 215 freeway interchange- so we are always accessible regardless of the weather. Just a few minutes drive East of Interstate 15 and not more than a few pipe lengths north of the new Interstate 210 extension between Alder and Locust Avenue; we can be easily reached for same day will-calls or walk-ins. See map